| 图片 | 厂商料号 | 库存情况 | 价格 | 数量 | 数据表 | 系列 | 包装 | 产品状态 | 类型 | 功能 | 使用的 IC / 部件 | 主要属性 | 次级属性 | 内容物 | 嵌入式 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
BQ24352EVMEVAL BOARD FOR BQ24352 Texas Instruments |
1 | - |
|
数据表 |
- | Box | Obsolete | Power Management | Battery Charger | BQ24352 | Li-Ion (1 Cell) | 4.5 ~ 26V Supply | Board(s) | No |
|
SN65LVDM31-32BEVMEVAL BRD SN65LVDM31 SN65LVDS32M Texas Instruments |
0 | - |
|
数据表 |
- | Bulk | Obsolete | Interface | LVDS, Transmitter | SN65LVDM31, SN65LVDS32M | - | - | Board(s) | - |
|
TPS2080EVMEVAL BOARD FOR TPS2080 Texas Instruments |
0 | - |
|
数据表 |
- | Bulk | Obsolete | Power Management | Power Distribution Switch (Load Switch) | TPS2080 | - | - | Board(s) | - |
|
|
BQ24004EVMEVAL BOARD FOR BQ24004/5/6 Texas Instruments |
0 | - |
|
数据表 |
- | Bulk | Obsolete | Power Management | Battery Charger | BQ24004/5/6 | Li-Ion / Li-Pol (1 Cell) | Safety Timer, Cell Temperature Monitoring, Status LEDs | Board(s) | No |
|
SN65LVDS122EVMEVAL BOARD FOR SN65LVDS122 Texas Instruments |
0 | - |
|
数据表 |
- | Bulk | Obsolete | Interface | LVDS, Crosspoint Switch/Multiplexer | SN65LVDS122 | - | - | Board(s) | - |
|
SN65LVCP22-23EVMEVAL BOARD SN65LVCP22 SN65LVCP23 Texas Instruments |
0 | - |
|
数据表 |
- | Bulk | Obsolete | Interface | LVDS, Crosspoint Switch/Multiplexer | SN65LVCP22, SN65LVCP23 | - | - | Board(s) | - |
|
SN65LVDS250EVMEVAL BOARD FOR SN65LVDS250 Texas Instruments |
0 | - |
|
数据表 |
- | Bulk | Obsolete | Interface | LVDS, Crosspoint Switch/Multiplexer | SN65LVDS250 | - | - | Board(s) | - |
|
ISO72XEVMEVAL BOARD FOR ISO721 ISO722 Texas Instruments |
0 | - |
|
数据表 |
- | Box | Obsolete | Interface | Digital Isolator | ISO721, ISO722 | - | - | Board(s) | - |
|
TPS65560EVM-165EVAL BOARD FOR TPS65560 Texas Instruments |
0 | - |
|
数据表 |
- | Bulk | Obsolete | Power Management | Special Purpose, Hand Held | TPS65560 | - | - | Board(s) | - |
|
ADS7845EVMEVAL BOARD FOR ADS7845 Texas Instruments |
0 | - |
|
数据表 |
- | Box | Obsolete | Interface | Touch Screen Controller | ADS7845 | - | 2.7V ~ 5.5V Supply | Board(s) | No |